We create solutions that last for decades without corrosion or maintenance.
Our products are certified to European standards, enabling us to participate in the largest infrastructure projects in Ukraine and the EU.
In this video, we take you on a tour of Metal Invest’s production facilities. You will see the full production cycle for steel structures of any complexity: from high-precision design to the final stage – hot-dip galvanising.
In the video, you will learn about:
- Our production capacity: how we process thousands of tonnes of steel every month.
- Our production facilities: the operation of modern CNC machines and automated production lines.
- The production of power line pylons and crossarms for the renewable energy sector. The manufacture of mobile communication towers for 4G/5G coverage.
- Reliable street lighting columns for modern cities.
- The secret to durability: our own hot-dip galvanising line operating at 450°C.
Today, it is a full-cycle industrial complex specialising in the design, manufacture and anti-corrosion protection of complex metal structures.
Our production sites in Cherkasy and Bila Tserkva are equipped with the necessary technical facilities to meet the needs of the energy and telecommunications sectors.
Our own equipment fleet, located in Bila Tserkva, ensures the supply of lattice high-voltage and low-voltage pylons (0.4–750 kV)
and steel gantries for power lines, with a capacity of up to 8,400 tonnes per year.
Leader in hot-dip galvanising in Ukraine (Cherkasy)
We operate the country’s most powerful anti-corrosion protection centre:
Unique dimensions: The largest bath in Ukraine, measuring 14 m x 1.6 m x 3.2 m.
This allows us to galvanise large-scale trusses, long-span poles and bridge structures weighing up to 6 tonnes.

Capacity: Production capacity of 14,000 tonnes of galvanised products per year.
Durability: Coating thickness from 45 µm (in accordance with ISO 9001:2018),
guaranteeing corrosion protection for up to 50 years, even in aggressive environments.